Please follow the below steps for SAP test box refresh from production box


1. Take the relevant screenshot of system

STMS,SCC4,SM59,SAP standard jobs,DB13,SLICENSE,CCMS settings,SPAD

2. Import the SPAD settings


3. Take the offline backup of production system


4. Take the backup of backSID.log,*.aft and initSID.ora of production and test server


5. Lock users in Test system


6. Take offline backup of test system


7. Open client in test server : SCC4


8. Export the client for profile SAP_USER in test server. Keep test system as target server

SCC8


9. Take the trace of control file on both the Test and production server


10. Stop the SAP instance and sap services


11. Note down the Schema users existing presently in the system

SQL> select user name from dba_users;


12. Shutdown the database


13. Copy last offline backup log file(*.aft) from production system to test server


14. edit the *.aft log file as per test server

change SID from prdoduction to test server SID, check ORA-HOME directory

15. Now restore the backup 

brrestore –c –m full –b XXX.aft

16. Connect to oracle as sqlplus /nolog, connect /as sysdba and type startup Nomount


17. Edit the controlfile of Prod. Change all production SID to test SID and  NORESETLOGS TO RESETLOGS


17. Use the edited controlfile of Prod to recreate the control file of Test

SQL> @Cntrl.sql
SQL>shutdown immediate;

18. SQL> Alter database open RESETLOGS


19. Create new OPS$ADM  using the below command.

I:\scripts>sqlplus /nolog @ORADBUSER.sql SAPSID NT DOMAIN SID  (IF SIDADM is local user then give the host name in the place of Domain Name)

20. After this run the script sapdba_role to set proper right for OPS$ user IDs.

>sqlplus /nolog @sapdba_role.sql

21. Check whether SAPSR3P (schema owner) account has been locked or not:

select username,account_status from dba_users where username=”SAPPCE”;

22. If it is locked use this command to unlock it:

alter user SAPPCE account unlock;

23. Start the SAP application



POST Processing Steps:


24. Update the license

Logon to SAP with DDIC-client 000; update the license key through the transaction SLICENSE

25. check the consistency

Go to transaction SICK for checking the consistency of the system.

26. check the local host entry

Go to transaction SE37 and execute BPT_LOCAL_HOSTNAME_CHECK to check for the hostname entry

27. Change the STMS configuration and perform post installation activity

Now go to transaction SE06 to perform post installation activities

28. Reconfiguring STMS 


29. Login into DCE client 000 with DDIC , goto transaction STMS


30. Schedule the standard jobs


Go to transaction SM36 and click on the button “Standard jobs” to schedule the standard jobs defined for the system


31. Import the user master of test server

Goto the STMS and import the user master request

32. Close the client


33. Changing the client description. 


34. Import profiles of active Server using RZ10


35. Delete incorrect instances defined in RZ04, create correct instances and assign Operation modes for the same 


36. Change the logical system name


37. Take an OFFLINE backup of the Test system and release the system to the users